ERCER | DESIGN, CONSTRUCTION AND FACILITIES

Outstanding projects

MSD

Ercer transformed a process space into an office space. The transformation included the change of all the outside carpentry, the consolidation of the façade, the treatment of part of the structure to give it fire resistance, the demolition of interior spaces and the complete transformation of all that space; floors,

...
View Project

CUNEF

At the university context, ERCER was in charge of the design and execution of the new CUNEF classrooms. This design was specially aimed for getting great comfort improvements. For this, the calculation of the line of sight was taken into account as well as the acoustic conditioning. This was a

...
View Project

FMOT

Ercer was contracted to design and carry out the execution of a marketing study center.A model supermarket and rooms for the study of consumer behaviour were built. This led to the development of very specific facilities, including audiovisual facilities (three rooms with video-mapping being installed) as well as closed-circuit TV

...
View Project

Greystar

Ercer was awarded the project for the design and build of the Madrid offices of the international Greystar.Based on Paseo de la Castellana, the project was able to give a particular character to the installation of this office located in multi-tenant building.The project reflected the character that this company tranfers

...
View Project

Sony Music

Ercer was hired to carry out the construction Works and part of the installations for the fit out of the new Sony Music offices. We must highlight the execution of the auditorium as well as the meeting rooms and multipurpose spaces. In this work, a great variety of types of

...
View Project

Alcalá de Henares University

ERCER was contracted for designing the facilities of the Universidad de Alcalá de Henares library located in the Cuartel del Príncipe.In this project, we bet for a finish with exposed installations which become an important part of the aesthetic. The attention paid to acoustic, in a space designed for silence

...
View Project

Loom

Ercer, awarded by tender, established the LOOM headquarters in Madrid. IT carried out Works for the conditioning of different rooms, spaces and new collaborative areas, in the set of five floors of the building placed on Calle Huertas, 11.Different demolition and refurbishment Works were carried out, the design of which

...
View Project

Sanitas Serrano

Ercer has made different offices and clinics for Sanitas (Bupa). Among all of them, this project stands out for being the most representative office of the company. Ercer was awarded the total demolition and refurbishment at Calle Serrano 67 in the capital of Spain.Ercer executes an ambitious project due to

...
View Project

Universal

After several years carrying out some renovations and maintenance at the Universal Pictures offices, Ercer was awarded the design and construction project for the Universal Consumer Products offices.The design and construction project were supervised by Universal´s international design team, achieving extraordinary results that were recognized by the client and its

...
View Project

Sephora

Ercer collaborates with Sephora in the development of its stores throughout the Iberian Peninsula.Store fittings were carried out in all kind of premises, both in shopping centers and at Street level stores. Projects carried out in very tight time frames with high quality finishes.Ercer also refurbished Sephora´s central offices in

...
View Project

Fitch Ratings

Ercer was selected and chosen for the turnkey project consisting of the design and execution of the Fitch Ratings offices in Madrid. Ercer designed, selected the finishes and carried out all the Works and installations of the premises.The project was developed in the Torres Colon in Madrid and highlights the

...
View Project

Cepsa

Hand by hand with DeArq Studio, and the architect Alejandro Bustillo, Cepsa chose our proposal for the transformation of the auditorium of its corporate headquarters. The proposal was about flexible and multifunctional space with great improvements in the acoustics of the room.The project endows the Cepsa Auditorium with a huge

...
View Project

Nationale Nederlanden

The implementation of the project for the central offices of National Nederlanden in Spain, was a great challenge for Ercer due to the quality of finishes and, over all, the tight deadlines with which it had, only 45 days.It involved the implementation of offices of more than 4000 sqm with

...
View Project

Accenture

Ercer was hired to carry out the civil Works and part of the installations for the implementation of the new Accenture offices at Torre Picasso in Madrid.Its special joinery work was highlighted, the design and manufacture of which was carried out in its workshop and later assembled on site.The Works

...
View Project

Microsoft

After ten years from the very first implementation in “La Finca”, the same professional team from Ercer once again transformed the Microsoft offices.Ercer carried out the demolition of the offices and carried out the work to implement the new space, providing Value Engineering in several construction solutions, achieving a significant

...
View Project

Orange

Ercer was awarded the construction and installation of several stores for Orange throughout the Spanish geography. This was about locals with a different and diverse nature located both in shopping centers, malls and at ground floor in shopping streets.In the project, the rhythm of the Works for the execution of

...
View Project

Nippon Gases

Once receiving the execution project for the refurbishment of Nippon Gases headquarters on Calle Orense in Madrid, Ercer proposed value engineering and the partial use of the existing air conditioning installation.Ercer was awarded the contract to set up office son four floors with a total area of 3700 sqm. The

...
View Project

Garrigues Training Centre

After several projects for Garrigues firm, ERCER was chosen for the design and refurbishment of the classrooms in the company´s study center.The project took into account key elements such as the view from all the occupied spaces, lighting, acoustics or the integration of audiovisuals media. All this without compromising the

...
View Project

Nationale Nederlanden

Ercer was chosen for designing and the execution of Nationale Nederlanden offices throughout the Spanish territory.Offices around 1000 sqm have the common characteristic of being located on the city center, which in most cases entails facing a building or protected environment as well as the difficulty of moving materials in

...
View Project

Homeaway

This project was carried out on three floors of the Torre Foster on Paseo de la Castellana. The design was up to an English studio. It was about different multidisciplinary spaces with a great variety of finishes. Ercer added its high level of quality in the finishes to the entire

...
View Project

The Netherlands Embassy

Ercer was awarded the design and execution of the Netherlands Embassy in Spain. Likewise, he dealt with the legalization of said space and getting the relevant licenses.The Embassy went from being an exempt building to occupying several floors of the Torre Espacio tower. All the fittings inside, facilities and special

...
View Project

IBM

Ercer was awarded the contract for the design and build of part of the IBM office son Calle Santa Hortensia in Madrid. The project was about to adapt the seventh floor as well as the terrace located on the third floor.The space underwent a total transformation from a concept of

...
View Project

Merlin

Ercer is awarded the contract for the execution of the Merlin offices in Madrid. These are offices that takes us to a wonderful space for the workers.Finished with neutral colours such as White, grey and Black give us elegance and comfort, while materials such as Wood, vegetation and wall coverings

...
View Project

Expedia

Ercer designs and builds the Expedia Headquarters in Madrid and Barcelona.In direct communication with Expedia´s Headquarters in Europe, based in London, Ercer developed the project to implement, reform the facilities and improve the image of the new offices in both Spanish cities.The project highlighted the design of informal environments and

...
View Project

Moody’s

After several years carrying out adaptation work in its offices, Moodys commissioned Ercer to build its new facilities.Ercer developed all the civil Works, the pre-connected audiovisual, voice and data installations. He was also in charge of the construction of the data processing center and the manufacture and assembly of a

...
View Project

Amazon

After a complex selection program for awarding a General Contractor, Ercer was awarded the contract to carry out the expansion of the Madrid offices of the large international logistics and technology sector.The design is carried out by an international architecture studio. I the case of an “Open Book” kind of

...
View Project

Santa Lucía

Ercer was chosen for designing and the execution of a new model of customer service office. It was intended to break with the concept of the office that the company had til that moment, looking for a different relationship with the client. In which they shared a more quality time

...
View Project

Sanitas Headquarters

Ercer carried out the comprehensive refurbishment of the two buildings that make up the Sanitas Headquarters in Madrid. The buildings located in Calle Ribera del Loira, exceed 12000 sqm in constructed area.In addition to the work floors, all the toilets were renewed and a new collaborative work area was made

...
View Project

BBVA

Ercer was awarded the contract to carry out Works of the new BBVA refurbishment complex at its headquarters in María Tubau 10 in Madrid.During the execution Works, the use of this space as a canteen for workers had to be maintained. This was a big difficulty that forced it to

...
View Project

Sulzer

Ercer was awarded as a general contractor to carry out the restructuring Works of the industrial warehouse for the new facilities of Sulzer Pumps Wastewater pain S.A., in Rivas VaciamadridThe Warehouse space is split into an office area, a workshop area and a storage area.For the implementation of the office

...
View Project

Schools

In 2021, ERCER started to collaborate with the Missionary Daughters of the Holy Family congregation for the remodelling of some Nazareth schools in Spain and America, wanting to adapt them to their new pedagogical proposals.The projects and planning of works were carried out in phases, for their precise execution during

...
View Project

Hitachi

Ercer carried out the design and implementation of the offices of the global marketing department of Hitachi company. The design was based on concepts such as flexibility, transparency and openness of the space. This represented a clear change in the image and ways of working of the company and from

...
View Project

Garrigues

After being awarded the design and execution project for the refurbishment of its auditorium in Madrid carried out to the entire client satisfaction, Ercer carried out the turnkey project for the design and building of a collaborative area in one of the floors of its Madrid headquarters. The building is

...
View Project

COEM

Ercer won the ideas tender organized by the Illustrious College of Dentists and Stomach experts of the first region and developed the execution project. It obtained the licenses and executed all the work and facilities for the implementation of the COEM headquarters. In this project, the multipurpose auditorium and the

...
View Project

Mastercard

Ercer was awarded through a tender for the construction of the new Mastercard offices in the city of Madrid.The office was in its totality a collaborative space, highlighting the construction of a large mulstidisciplinary room that could be transformed into various use scenarios through mobile panels and furniture. In this

...
View Project

Sanitas Auditorium

Ercer was awarded the contract for the refurbishment and fitting out of the ground floor of Fundación Sanitas Building at its Corporate Headquarters, located in Calle Ribera del Loira.On a space previously dedicated to housing an auditorium, Ercer carried out the implementation of a flexible multifunctional space, with the possibility

...
View Project