ERCER | DESIGN, BUILDING AND FACILITIES

Outstanding
projects

Moody’s

After several years carrying out adaptation work in its offices, Moodys commissioned Ercer to build its new facilities.Ercer developed all the civil Works, the pre-connected audiovisual, voice and data installations. He was also in charge of the construction of the data processing center and the manufacture and assembly of a

...
View Project

The Netherlands Embassy

Ercer was awarded the design and execution of the Netherlands Embassy in Spain. Likewise, he dealt with the legalization of said space and getting the relevant licenses.The Embassy went from being an exempt building to occupying several floors of the Torre Espacio tower. All the fittings inside, facilities and special

...
View Project

Greystar

Ercer was awarded the project for the design and build of the Madrid offices of the international Greystar.Based on Paseo de la Castellana, the project was able to give a particular character to the installation of this office located in multi-tenant building.The project reflected the character that this company tranfers

...
View Project

Sony Music

Ercer was hired to carry out the construction Works and part of the installations for the fit out of the new Sony Music offices. We must highlight the execution of the auditorium as well as the meeting rooms and multipurpose spaces. In this work, a great variety of types of

...
View Project

Nationale Nederlanden

The implementation of the project for the central offices of National Nederlanden in Spain, was a great challenge for Ercer due to the quality of finishes and, over all, the tight deadlines with which it had, only 45 days.It involved the implementation of offices of more than 4000 sqm with

...
View Project

Homeaway

This project was carried out on three floors of the Torre Foster on Paseo de la Castellana. The design was up to an English studio. It was about different multidisciplinary spaces with a great variety of finishes. Ercer added its high level of quality in the finishes to the entire

...
View Project

FMOT

Ercer was contracted to design and carry out the execution of a marketing study center.A model supermarket and rooms for the study of consumer behaviour were built. This led to the development of very specific facilities, including audiovisual facilities (three rooms with video-mapping being installed) as well as closed-circuit TV

...
View Project

Amazon

After a complex selection program for awarding a General Contractor, Ercer was awarded the contract to carry out the expansion of the Madrid offices of the large international logistics and technology sector.The design is carried out by an international architecture studio. I the case of an “Open Book” kind of

...
View Project

BBVA

Ercer was awarded the contract to carry out Works of the new BBVA refurbishment complex at its headquarters in María Tubau 10 in Madrid.During the execution Works, the use of this space as a canteen for workers had to be maintained. This was a big difficulty that forced it to

...
View Project

Microsoft

After ten years from the very first implementation in “La Finca”, the same professional team from Ercer once again transformed the Microsoft offices.Ercer carried out the demolition of the offices and carried out the work to implement the new space, providing Value Engineering in several construction solutions, achieving a significant

...
View Project

Merlin

Ercer is awarded the contract for the execution of the Merlin offices in Madrid. These are offices that takes us to a wonderful space for the workers.Finished with neutral colours such as White, grey and Black give us elegance and comfort, while materials such as Wood, vegetation and wall coverings

...
View Project

Fitch Ratings

Ercer was selected and chosen for the turnkey project consisting of the design and execution of the Fitch Ratings offices in Madrid. Ercer designed, selected the finishes and carried out all the Works and installations of the premises.The project was developed in the Torres Colon in Madrid and highlights the

...
View Project

Cepsa

Hand by hand with DeArq Studio, and the architect Alejandro Bustillo, Cepsa chose our proposal for the transformation of the auditorium of its corporate headquarters. The proposal was about flexible and multifunctional space with great improvements in the acoustics of the room.The project endows the Cepsa Auditorium with a huge

...
View Project

Hitachi

Ercer carried out the design and implementation of the offices of the global marketing department of Hitachi company. The design was based on concepts such as flexibility, transparency and openness of the space. This represented a clear change in the image and ways of working of the company and from

...
View Project

Sanitas Headquarters

Ercer carried out the comprehensive refurbishment of the two buildings that make up the Sanitas Headquarters in Madrid. The buildings located in Calle Ribera del Loira, exceed 12000 sqm in constructed area.In addition to the work floors, all the toilets were renewed and a new collaborative work area was made

...
View Project

COEM

Ercer won the ideas tender organized by the Illustrious College of Dentists and Stomach experts of the first region and developed the execution project. It obtained the licenses and executed all the work and facilities for the implementation of the COEM headquarters. In this project, the multipurpose auditorium and the

...
View Project

Accenture

Ercer was hired to carry out the civil Works and part of the installations for the implementation of the new Accenture offices at Torre Picasso in Madrid.Its special joinery work was highlighted, the design and manufacture of which was carried out in its workshop and later assembled on site.The Works

...
View Project

MSD

Ercer transformed a process space into an office space. The transformation included the change of all the outside carpentry, the consolidation of the façade, the treatment of part of the structure to give it fire resistance, the demolition of interior spaces and the complete transformation of all that space; floors,

...
View Project

Garrigues

After being awarded the design and execution project for the refurbishment of its auditorium in Madrid carried out to the entire client satisfaction, Ercer carried out the turnkey project for the design and building of a collaborative area in one of the floors of its Madrid headquarters. The building is

...
View Project

Universal

After several years carrying out some renovations and maintenance at the Universal Pictures offices, Ercer was awarded the design and construction project for the Universal Consumer Products offices.The design and construction project were supervised by Universal´s international design team, achieving extraordinary results that were recognized by the client and its

...
View Project

Mastercard

Ercer was awarded through a tender for the construction of the new Mastercard offices in the city of Madrid.The office was in its totality a collaborative space, highlighting the construction of a large mulstidisciplinary room that could be transformed into various use scenarios through mobile panels and furniture. In this

...
View Project

Loom

Ercer, awarded by tender, established the LOOM headquarters in Madrid. IT carried out Works for the conditioning of different rooms, spaces and new collaborative areas, in the set of five floors of the building placed on Calle Huertas, 11.Different demolition and refurbishment Works were carried out, the design of which

...
View Project

Sanitas Auditorium

Ercer was awarded the contract for the refurbishment and fitting out of the ground floor of Fundación Sanitas Building at its Corporate Headquarters, located in Calle Ribera del Loira.On a space previously dedicated to housing an auditorium, Ercer carried out the implementation of a flexible multifunctional space, with the possibility

...
View Project

Nippon Gases

Once receiving the execution project for the refurbishment of Nippon Gases headquarters on Calle Orense in Madrid, Ercer proposed value engineering and the partial use of the existing air conditioning installation.Ercer was awarded the contract to set up office son four floors with a total area of 3700 sqm. The

...
View Project

Expedia

Ercer designs and builds the Expedia Headquarters in Madrid and Barcelona.In direct communication with Expedia´s Headquarters in Europe, based in London, Ercer developed the project to implement, reform the facilities and improve the image of the new offices in both Spanish cities.The project highlighted the design of informal environments and

...
View Project

IBM

Ercer was awarded the contract for the design and build of part of the IBM office son Calle Santa Hortensia in Madrid. The project was about to adapt the seventh floor as well as the terrace located on the third floor.The space underwent a total transformation from a concept of

...
View Project