Ercer was awarded as a general contractor to carry out the restructuring Works of the industrial warehouse for the new facilities of Sulzer Pumps Wastewater pain S.A., in Rivas Vaciamadrid

The Warehouse space is split into an office area, a workshop area and a storage area.

For the implementation of the office area, an intermediate floor was built with a lightened slab on a metallic structure. In the workshop area, we added the changing rooms next to it and the construction of a test bench inside the Warehouse was carried out, creating a pit more than four meters Deep lined with reinforced concrete and gunite concrete, suitably waterproofed, to carry out the sewage pump testing.

All the new installations were made highlighting the sanitation network of the workshop and changing rooms as well as the air conditioning installation and electrical panels to service the work benches.

Share:

Sulzer

duracion

TIME

10 weeks

superficie

SURFACE

4.000 sqm

estatus

STATUS

Complete

ubicacion

LOCATION

Rivas Vaciamadrid, Spain